The maintenance of oxy hydrogen generator
2015-08-05
1, under normal circumstances, will be provided with the machine every six months to put out a new one liquid electrolyte. As work (gas production unchanged) then a year maintenance time. Cleaning fluid change operations, see Chapter XIV.
2, periodically check whether the machine loose fittings or air leak.
Methods: just close the gas valve gas devices with or directly block the rear panel of the outlet pressure gauge to set overpressure, usually (0.19Mpa), whether it will fall to 5 minutes. If yes, the machine has a leak; if not, then use the machine properly, there is need to re-tighten the seal air leaks.
3, often with dry compressed air to clean power and machine.
2, periodically check whether the machine loose fittings or air leak.
Methods: just close the gas valve gas devices with or directly block the rear panel of the outlet pressure gauge to set overpressure, usually (0.19Mpa), whether it will fall to 5 minutes. If yes, the machine has a leak; if not, then use the machine properly, there is need to re-tighten the seal air leaks.
3, often with dry compressed air to clean power and machine.
4, regularly check the machine solenoid switch situation, that is when the water indicator light their water solenoid valves for normal magnetic phenomenon.
Previous--Next