The operating details of oxy hydrogen generator
2015-08-18
1, first check before starting the electrolyzer and security seal level is within a predetermined range, each manifold valve is open. Cell level should be between the upper and lower mark. Security seal level should be in the view of the liquid pipe off the assembly line more than 10 cm.
2. Open button switch to start the machine, rotating clockwise until the current regulation electrolysis current indicated by the ammeter reaches the required value 200A-240A before normal use. ʱ??
3, the machine starts to observe pressure gauge should only ignited the torch between 0.05MPa-0.08MPa. If the point of the torch vain tempering phenomenon, should check whether the muzzle tighten or damage, pipeline leaks, whether there is water gun. If you have these problems should be treated before use. ʱ??
4, should be opened after the shutdown bleed valve behind the machine, let go of the residual gas. Operating workers can take advantage of the continuous casting machine maintenance time security seal flushing and changing the water. ʱ??
5, in case the machine is less than the current tone 200A, the voltmeter shows this occurs at 120V or more, shall promptly either to fill within the cell, potassium hydroxide 5Kg. ʱ??
2. Open button switch to start the machine, rotating clockwise until the current regulation electrolysis current indicated by the ammeter reaches the required value 200A-240A before normal use. ʱ??
3, the machine starts to observe pressure gauge should only ignited the torch between 0.05MPa-0.08MPa. If the point of the torch vain tempering phenomenon, should check whether the muzzle tighten or damage, pipeline leaks, whether there is water gun. If you have these problems should be treated before use. ʱ??
4, should be opened after the shutdown bleed valve behind the machine, let go of the residual gas. Operating workers can take advantage of the continuous casting machine maintenance time security seal flushing and changing the water. ʱ??
5, in case the machine is less than the current tone 200A, the voltmeter shows this occurs at 120V or more, shall promptly either to fill within the cell, potassium hydroxide 5Kg. ʱ??
6, electrician, mechanic should be inspected daily operational status of equipment, identify problems in time. Class should be cleaned of dust and dirt equipment and Hydroxide occurs inside the station, with the operation of the workers proper use and maintenance of stable hydrogen generator.