Care and maintenance of hho generator
2015-11-03
1, under normal circumstances, every six months using an electrolyte within the machine will put out new ones added. As work (gas production unchanged) the maintenance once a year.
2, periodically check whether the machine is loose fittings or air leak.
Methods: just close the gas valve gas devices with or directly block the rear panel of the outlet pressure gauge pointer to overvoltage setpoint, typically (0.19Mpa), whether it will fall to 5 minutes. If yes, the machine has a leak; if not, then use the machine properly, there is need to re-tighten the sealing air leaks.
3, often with dry compressed air to clean power and machine.
2, periodically check whether the machine is loose fittings or air leak.
Methods: just close the gas valve gas devices with or directly block the rear panel of the outlet pressure gauge pointer to overvoltage setpoint, typically (0.19Mpa), whether it will fall to 5 minutes. If yes, the machine has a leak; if not, then use the machine properly, there is need to re-tighten the sealing air leaks.
3, often with dry compressed air to clean power and machine.
4, regularly check the machine solenoid switch situation, that is when the water indicator light their water solenoid valve if there is a normal magnetic phenomenon.
Previous--Next